Greater Orlando Aviation Authority

South Terminal APM and Train Station

Size South APM - 200,000 SF 7,500 SF Dual-lane guideway 2,400 space parking garage
Completion Date South APM - Fall 2017 / ITF - Late 2018
Contact Reference David Thomas, AIA RID
Services
  • ADA and Code Required Environmental Graphic Design
  • Wayfinding and specialty signage for site, building, and interior
Architect of Record
HKS Architects, Inc.

Project Description:

The South Airport Automated People Mover (APM) complex consists of approximately 200,000 square feet, including he station for the APM system which will connect passengers to the North Terminal via 7,500 feet of dual-lane guideway, similar to those that connect the existing gates areas to the North Terminal, as well as a 2,400-space parking garage. The South APM is scheduled to open in Fall 2017.

The Intermodal Terminal Facility (ITF) consists of approximately 1.3 million square feet of terminal space accommodating the South APM and up to three regional rail systems (SunRail, Brightline, and possibly a magnetic levitation system serving the International Drive area). It will also support ground transportation activity including taxis, shuttle buses and public bus operations. The ITF is scheduled to open in 2018.

The project aims towards LEED Certified v4-BD+C.