Greater Orlando Aviation Authority

North Terminal Lobby Improvements Signage Design and Wayfinding

Size 80,000 square feet
Completion Date Fall 2016 through Late 2018
Contact Reference Tim McNicholas, AIA
Services
  • ADA and Code Required Environmental Graphic Design
  • Wayfinding and specialty signage for site, building, and interior
Architect of Record
C.T.Hsu+Associates, P.A.

Project Description:

The ticket lobbies are being expanded and updated with self-assisted counters which will increase the capacity efficiency of passenger processing. This involves moving the exterior walls out towards the departures curb, replacement of the check-in desks with modular units, and replacement of the back-wall signage with LED screens which will display a range of information including airline branding, flight information, security wait times and interactive entertainment. To improve navigation throughout the terminal, all static signage is also being updated and replaced with efficient LED illuminated cabinets and innovative multi-display LCD digital wayfinding. The first section of new ticket counters was unveiled in September 2016, with the last section scheduled for Fall 2017 completion. Overall completion of the project is anticipated for late 2018.

Orlando | Philadelphia | Cocoa Beach